The network that makes the grading plan work
RCP, HDPE, structures and stormwater conveyance.
RCP and HDPE storm systems, precast structures and outlet protection, installed in step with the grades around them.
Built into the bigger picture.
The crews. The equipment. The coordination.
Storm drainage, sanitary sewer, water distribution, force mains and complex underground systems, installed by our own crews alongside our grading and roadway operations.
Marks Clearing & Grading self-performs wet utility installation as a core part of its turnkey sitework scope.
Underground work shapes what happens above it. Our utility teams work with the broader Marks operation to plan access, sequence installation and keep the next phase in view.
Wet utilities are a core, self-performed part of the Marks scope, not a line item we hand off. We have built strong relationships with municipalities and inspectors around Raleigh and throughout the Carolinas, and our crews coordinate in the field to keep utility work moving safely and efficiently.


RCP, HDPE, structures and stormwater conveyance.
RCP and HDPE storm systems, precast structures and outlet protection, installed in step with the grades around them.

Gravity sewer, manholes, laterals and tie-ins.
Gravity mains, laterals, manholes and offsite tie-ins, installed to municipal specification and inspected as we go.

Mains, valves, hydrants and service connections.
Water mains, valves, hydrants and services, pressure tested and disinfected for a clean handoff to the utility.

Onsite and offsite force main runs, including long road crossings and the coordination that comes with them.

Wet wells, valve vaults and pump station installs handled in house, with the deep excavation they require. Rolesville Crossing and Elliott Farms are recent examples.

Deep underground detention and SCM structures built to hold stormwater long after the site is turned over.
Deep excavations, difficult crossings and changing ground conditions require planning and field coordination. We bring utility experience into those decisions early, before the first pipe goes in.


We handle rock just as fast as dirt. Rock is planned for in preconstruction, and when a line needs drilling and blasting, we line up the shot, often with a driller partner, while our own crews dig, load and haul the rock. One line does not hold up the rest of the site.

Deep sewer, wet wells and pump stations call for shoring, dewatering and crews who work safely at depth.

Aerial sewer over wetlands, stream crossings and sensitive buffers each come with their own permits, access limits and inspection schedule. We plan for them from the start. Arvin and Gatsby Station are recent examples.
A 57-acre KB Home development delivering 154 homes, with mass grading, roadway widening and one of the largest utility scopes we have run on a single residential site. Storm, sewer, water and an offsite force main were installed alongside our own grading crews so no phase sat waiting on another.










Storm drainage, sanitary sewer, water distribution, force mains, pump stations and underground detention systems, installed by Marks crews alongside our grading and roadway operations.
Yes. Our crews install RCP and HDPE storm systems and precast structures, as well as gravity sewer mains, laterals, manholes and offsite tie-ins.
Yes. Our crews build pump stations in house, from the deep excavation to the wet well, valve vault and force main. Rolesville Crossing and Elliott Farms are recent examples.
Yes. We handle rock just as fast as dirt. Rock is planned for in preconstruction; when drilling and blasting are needed, we line up the shot, often with a driller partner, and our own crews handle the rock. We also bring shoring and dewatering experience to deep sewer, detention and pump station work.
From our Raleigh home base, on projects throughout the Carolinas, working with municipalities and inspectors across the region.
When one team runs both, utility installation is sequenced with grading and roadway work, so each phase is ready for the next and the site is not waiting on separate crews.
Bring Marks into the conversation early. Tell us about the utility scope and what the rest of your project needs to accomplish.