Silt Fence
Perimeter fence installed before land disturbance to hold sediment on site.
Ready before the rain.
Installed early. Maintained through the job.
Sediment basins, skimmers, diversions, matting and inlet protection installed ahead of the work they protect, and kept working by the crews already on site.
Marks installs and maintains erosion and sediment control as part of its sitework scope, on the same schedule as the clearing and grading it protects.
Erosion and sediment control is the first thing an inspector looks at and the last thing anyone wants to fix under pressure. Marks installs and maintains the erosion control package as part of the sitework scope, on the same schedule as the clearing and grading it protects.
Because our crews are already on the site, a measure that gets damaged on Tuesday is repaired on Tuesday.
The goal is not passing a single inspection. It is keeping the site workable through the wet weeks so grading, utilities and paving keep moving.

Erosion control on a Marks job is scoped with the earthwork, not bolted on after it. Each measure is installed, inspected and maintained on the same schedule as the work it protects.
Perimeter fence installed before land disturbance to hold sediment on site.
Stabilized stone entrances that keep mud off public roads.
Built to the approved design and to the drainage area actually feeding them.
Skimmers draw cleaner water off the top while baffles slow the flow through the basin.
Runoff routed into the basins instead of across a fresh cut.
Water carried down new slopes without cutting into them.
Matting, seed and stabilization so soil stays where it was placed.
Sediment kept out of the storm system as structures come online.
When the grading plan changes, the erosion control plan changes with it, on the same site visit. Here is how the measures follow the work from first disturbance to closeout.
The perimeter goes in first.
Basins come online as the ground opens up.
Fresh slopes protected as they are cut.
Structures protected as they come online.
The site is handed over stable.
Rain stops work. The repairs decide whether you restart on Monday or Thursday.
Basins are cleaned out before they lose capacity, because a full basin is the same as no basin.
Damaged measures are repaired by the crews already on site, without waiting on a separate mobilization.
The site is stabilized and ready for inspection so grading, utilities and paving can restart.
A 95-acre residential development for Lennar with 297 homesites, where the stormwater and erosion control scope included seven sediment control basins with baffles, risers, skimmers and emergency spillways, alongside more than 52,000 CY of pond excavation.



Erosion and sediment control on active Marks sites.







Silt fence, construction entrances, sediment basins with skimmer outlets and baffles, diversion ditches, slope drains, matting, inlet protection, and seeding and stabilization.
Perimeter measures go in before land disturbance starts. Basins, diversions and stabilization are added as clearing and grading progress, following the approved plan.
The Marks crews running the job. Measures are inspected, cleaned out and repaired through the life of the project, then removed and the ground stabilized at closeout.
Yes. Sediment basins, skimmer outlets and baffles are built to the approved design and checked against the drainage area actually feeding them.
From our Raleigh-area home base in Wendell, North Carolina, on projects throughout the Carolinas.
Share your plans and schedule. We will scope the erosion control with the earthwork so the site is ready before the weather turns.
Cookies
We use cookies to understand how visitors use our site and improve it. Privacy Policy