Stone arrives when the subgrade is ready
We run our own fleet of trucks, so base stone is not a phone call to a hauler and a two-day wait. It is a dispatch decision we make ourselves, on the same site, the same morning.
From subgrade to final lift.
The finish work that opens a site.
Fine grading, stone base, curb and gutter, sidewalk and asphalt, delivered on the same schedule as the grading and utilities beneath them.
Marks delivers the road section with its own fine grading crews and trucks, working with trusted trade partners for curb, sidewalk and asphalt.
Our fine grading crews and trusted trade partners deliver clean, durable curb, sidewalk and asphalt work that stands the test of time.
We understand local standards and requirements and work closely with inspectors, which helps get proof rolls approved quickly and keeps paving smooth from start to finish.
Because we are already on the site running the grading, the utilities and the trucking, the road section never waits on a mobilization. Stone shows up when the subgrade is ready, and paving follows the schedule instead of chasing it.



Each layer is built on the one beneath it, so each one is checked before the next goes down. Same site, same team, same schedule.
Subgrade cut to line and grade, proof rolled and undercut where it needs it, before a single stone goes down.
Aggregate base hauled with our own trucks, spread and compacted to the thickness the section calls for.
We know local standards and work with inspectors directly, which is how proof rolls get approved and stay approved.
Concrete curb, gutter, valley gutter and sidewalk placed clean and straight with trusted trade partners.
Base and surface lifts placed and rolled, including roadway widening and offsite DOT tie-ins.
Punch list, cleanup and handoff, so the road is ready for vertical construction and, eventually, for the town.

We run our own fleet of trucks, so base stone is not a phone call to a hauler and a two-day wait. It is a dispatch decision we make ourselves, on the same site, the same morning.

A failed proof roll costs days and credibility. We build the subgrade to hold, walk it with the inspector and fix problems before they become inspection findings.
Recent road and paving scopes from Marks project records.



A 57-acre KB Home development for 154 homes, with major roadway widening and infrastructure improvements to support future traffic. Our crews carried Magnolia from raw ground through mass grading and 26,500 LF of utilities, then straight into the road section without a gap between phases.
Phases that started as raw dirt or rock, delivered as finished streets ready for vertical construction.






Fine grading, stone base and curb work on Marks sites.









Fine grading, aggregate stone base, concrete curb and gutter, valley gutter, sidewalk, and asphalt base and surface lifts, along with roadway widening and offsite DOT tie-ins.
Yes. Marks runs its own trucks, so base stone is dispatched when the subgrade is ready instead of waiting on an outside hauler.
We build the subgrade to hold, walk it with the inspector and fix issues before they become findings. Knowing local standards helps proof rolls get approved quickly.
Marks fine grading crews prepare the road section, and trusted trade partners place curb, sidewalk and asphalt on the same schedule.
Yes. Magnolia Forest included major roadway widening with curb, gutter, asphalt and offsite DOT tie-ins, and Rolesville Crossing included widening of Mitchell Mill and Rolesville roads with full right-of-way restoration.
On projects throughout the Carolinas, from our Raleigh home base in Wendell, North Carolina.
Share your plans and schedule. We will show you how the grading, utilities, stone and paving come together on one schedule.